Proyek PT. Melindo Raya Industrial Lawang

mol1
FABRIKASI DAN PEMASANGAN DUCTING
1
PEMBONGKARAN KONDENSOR Lt.5 DAN Lt.6
2
MODIFIKASI CWS DAN CWR
3
PEMBONGKARAN DAN PEMBUATAN PLATFORM DISAMPING UTARA GUDANG ALKOHOL
4
PEMASANGAN BYPASS OUTLET POMPA SPRAY POND DAN PENGGANTIAN VALVE 8" YANG RUSAK
5
PENGGANTIAN ATAP DI BOILER TAIHU 3 & 4
6
PEMASANGAN ISOLASI PIPA STEAM BOILER VINASSE
7
REPAIR PONDASI FURNACE DP 4 YANG PECAH DAN REPAIR PLAT FURNACE DP 4 BAGIAN BYPASS
8
PEMBUATAN PIPERACK 2ND PLANT DISTILASI
9
PEMASANGAN PIPA FEED CONDENSATE STEAM DIST.2
10
PEMASANGAN PIPA STEAM COMPRESOR, AIR SUMBER WARAS, DAN SPENTLESS KE DISTILASI 2
11
PEMASANGAN ISOLASI PIPA STEAM FEED DIST 2
12
PEMASANGAN PIPA PRODUKSI ALKOHOL DAN PEMASANGAN CONTROL VALVE  CWR  DIST.2
13
PEMASANGAN SALURAN AIR VACCUM & MECH SEAL
14
PEMASANGAN VALVE DAN FLANGE DI DISTRIBUTOR PIPA CWR
15
PEMASANGAN NOZZLE CWS DAN CWR DAN VALVE STEAM HEADER EVAP 60 BRIX
16
PEMASANGAN SALURAN EVAPORATOR BRIX 60
99
PEMASANGAN PIPA SALURAN ES KE T.TIMBUNAN DAN PASANG SALURAN PEAMDAM KE TANGKI HARIAN
100
PEMASANGAN PENGUAT TANGKI
66
COBLOSAN SALURAN 18” DAN CT8003
67
PEMASANGAN PERPIPAAN TETES T1020 BESERTA KELENGKAPANNYA
68
PEMASANGAN PIPA KURASAN EXCEL
69
REPAIR PAN GRANUL KALIUM
70
SERVIS PENAMBALAN LEAKAGE LINE SYSTEM
71
PEMASANGAN PIPA STEAM CIP EXCEL
72
PEMBONGKARAN VALVE UAP 4B DAN 4A
73
PERBAIKAN PLENGSENGAN GUDANG MATERIAL
74
PENGURASAN ENDAPAN LANDFILL 2
75
PEMASANGAN JALUR PIPA SPENTLESS
76
PEMBUATAN DAN PEMASANGAN
77
PEMASANGAN JALUR SETAPAK DAN PEMBATAS SERTA SAMBUNGAN PIPA FEED REFLUX WWC
78
PEMBUATAN JALAN SETAPAK DAN PEMBATAS PIPA TETES
79
PEMBONGKARAN ECONOMIZER
80
PERUBAHAN ELEVASI OFA DAN PENGELASAN JALUR SPRAY GUN BOILER VINASE
81
MODIFIKASI SALURAN FEED DAN SALURAN SCRUBBER DISTILASI 2