Proyek PT. Melindo Raya Industrial Lawang

FABRIKASI DAN PEMASANGAN DUCTING

PEMBONGKARAN KONDENSOR Lt.5 DAN Lt.6

MODIFIKASI CWS DAN CWR

PEMBONGKARAN DAN PEMBUATAN PLATFORM DISAMPING UTARA GUDANG ALKOHOL

PEMASANGAN BYPASS OUTLET POMPA SPRAY POND DAN PENGGANTIAN VALVE 8" YANG RUSAK

PENGGANTIAN ATAP DI BOILER TAIHU 3 & 4

PEMASANGAN ISOLASI PIPA STEAM BOILER VINASSE

REPAIR PONDASI FURNACE DP 4 YANG PECAH DAN REPAIR PLAT FURNACE DP 4 BAGIAN BYPASS

PEMBUATAN PIPERACK 2ND PLANT DISTILASI

PEMASANGAN PIPA FEED CONDENSATE STEAM DIST.2

PEMASANGAN PIPA STEAM COMPRESOR, AIR SUMBER WARAS, DAN SPENTLESS KE DISTILASI 2

PEMASANGAN ISOLASI PIPA STEAM FEED DIST 2

PEMASANGAN PIPA PRODUKSI ALKOHOL DAN PEMASANGAN CONTROL VALVE CWR DIST.2

PEMASANGAN SALURAN AIR VACCUM & MECH SEAL

PEMASANGAN VALVE DAN FLANGE DI DISTRIBUTOR PIPA CWR

PEMASANGAN NOZZLE CWS DAN CWR DAN VALVE STEAM HEADER EVAP 60 BRIX

PEMASANGAN SALURAN EVAPORATOR BRIX 60

PEMASANGAN PIPA SALURAN ES KE T.TIMBUNAN DAN PASANG SALURAN PEAMDAM KE TANGKI HARIAN

PEMASANGAN PENGUAT TANGKI

COBLOSAN SALURAN 18” DAN CT8003

PEMASANGAN PERPIPAAN TETES T1020 BESERTA KELENGKAPANNYA

PEMASANGAN PIPA KURASAN EXCEL

REPAIR PAN GRANUL KALIUM

SERVIS PENAMBALAN LEAKAGE LINE SYSTEM

PEMASANGAN PIPA STEAM CIP EXCEL

PEMBONGKARAN VALVE UAP 4B DAN 4A

PERBAIKAN PLENGSENGAN GUDANG MATERIAL

PENGURASAN ENDAPAN LANDFILL 2

PEMASANGAN JALUR PIPA SPENTLESS

PEMBUATAN DAN PEMASANGAN

PEMASANGAN JALUR SETAPAK DAN PEMBATAS SERTA SAMBUNGAN PIPA FEED REFLUX WWC

PEMBUATAN JALAN SETAPAK DAN PEMBATAS PIPA TETES

PEMBONGKARAN ECONOMIZER

PERUBAHAN ELEVASI OFA DAN PENGELASAN JALUR SPRAY GUN BOILER VINASE

MODIFIKASI SALURAN FEED DAN SALURAN SCRUBBER DISTILASI 2